Essential infrastructure
Design software (AutoCAD Electrical / EPLAN); ERP/inventory system for material planning; proper earthing & power supply in the workshop; storage racks for switchgears, wires and busbars.
Standards
Design software (AutoCAD Electrical / EPLAN); ERP/inventory system for material planning; proper earthing & power supply in the workshop; storage racks for switchgears, wires and busbars.
Bus Bar Bending Machine, Bus Bar Cutting Machine, Bench Grinding Machine, Pillar Type Drilling Machine, Surface Grinder, Tapping Machine, Spot Welding Machine, Hand Drills, FRP Cutting Machine, OH Crane, Spanner set, CNC Turret Punch/Shearing Machine, Bending Machine, Welding Machine, Grinding & Finishing Machine, Drilling & Tapping Machine, Powder Coating/Painting Booth with Oven, hand tools (angle grinder, drilling set), and a JV with a fabrication unit.
Megger Digital Rechargeable Tester, AC Current Clamp-meter, Multi-meter, HV Tester, Vernier Caliper, Coating thickness gauge, Earth Resistance Tester, Primary Injection Kit, Secondary Injection Kit, Load Bank, Continuity Tester, and all other testing facilities.
Fully equipped with CAD facilities for design, state-of-the-art plant & machinery for manufacturing, and high-precision, accurate, duly-calibrated testing infrastructure.



